See if franchising is right for you.

2MBA – Production Plan

The initial assembly plants for the MVU and La Barista will be located at the Arsenal Business Center in Philadelphia.

7.1 Production Policy

  • 2MBA, Inc. will outsource production aspects where possible.
  • Components are delivered on a “just-in-time” basis.
  • Quality checks are in place throughout the assembly process (Appendix E).

7.2 Plant Location and Layout

  • Based on the Australian production experience, the five divisions (MVU assembly, La Barista assembly, Administration, R & D, and Warehousing) will be housed together.
  • A total floor plan of 2,400 square feet will be sufficient to house these functional areas (see Appendix E).
  • Systems approach to assembly
  • Scaleable factory design

7.3 Production Capacity (units)

MVU La Barista
Year 1 420
Year 2 480 900
Year 3 480 2100
Year 4 480 3300
Year 5 480 4500

7.4 Production Scheduling

The manufacturing process is supported by sophisticated production management software. It consists of a fully relational database which keeps track of inventory and invoicing and it produces detailed job cards for each day’s operations.

7.5 Supplies and Inventory

To ensure a consistently high quality product in both the MVU and La Barista, “hospital grade” stainless steel and other quality components are used. Efficient and accurate stock control is vital for the manufacturing of the MVU (which comprises over 270 parts) and the La Barista. Stock is managed through in-house software, specifically designed for the 2MBA, Inc.’s manufacturing process. The system enables management to instantly access:

  • All parts and materials on hand
  • Raw materials required to meet orders placed
  • Suppliers database with lead times, credit terms, price and contact details
  • Under and over stock warnings
  • Payment due date and credit position
  • Quality control is a standard procedure at the completion of every task.

In addition, checkpoints within the production process have been put in place to guarantee standards.


 

2MBA
Table of Contents Appendices
0. Executive Summary
1. The Offer
2. The Products
3. The Organization
4. Strategic Analysis
5. Key Strategic Issues
6. Marketing Plan
7. Production Plan
8. Organization Plan
9. Financial Plan
A. Internal Environment Analysis
B. Critical Risks and Problems
C. SWOT Analysis
D. Testimonials
E. Production Layout
F. Action Plan
G. Team Member Details
H. Reference Sources
I. Financial Analysis Worksheets
All information herein is confidential and belongs to 2MBA, Inc.
Get help with writing a business plan or choosing a franchise.

Talk to a Consultant

Services of Interest

5 + 12 =